Social Work Complex Air Conditioning Chiller System Installation

A new air conditioning chiller system and the associated distribution lines are being installed at the Social Work Complex.  Facilities Management will need to close some of the pedestrian walkways around the Complex during this installation process:

  • A portion of the courtyard in the middle of the Complex will be closed off from Saturday, April 8th, through Sunday, April 16th.
  • A portion of the parking lot north of Buildings A & B and the area between the buildings south to the courtyard area will be closed for construction crane access on Saturday, April 15th, but reopened no later than Sunday, April 16th.

Please let your faculty and staff members know as necessary.  Care will be taken to insure adequate access points into the buildings are available at all times.  We apologize for any inconvenience this may cause, and thank you for your cooperation.  If you have any questions, concerns, or special requirements during this time frame, please let us know.

Comments are closed