Archive for category May Construction 2011

Week of May 30, 2011

Davis Hall Lot F-9

The Davis Hall lot F-9 will be closed for striping on Saturday June 4th.  It will only be out of service the one day.  Anyone working over the weekend will need to park in the Trinity lot directly across the street.  In the event of rain on Saturday the striping will be re-scheduled for Sunday, June 5th.

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Gateway Monument

A construction picture of the Gateway Monument showing the final 10 yards of concrete being poured for the structure roof.  It was taken from the roof of the ERB building. This week the scaffolding will be taken down and site work will start. The Monument should be complete in approximately 6-7 weeks.

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

University Center Market

The University Center Market renovation has started.  There will be some noise associated with the project for the surrounding area and the Market will be closed through the summer.  It will reopen for the fall semester.

Week of May 16, 2011

Water Service Outage

There will be a water service outage for Life Science, University Hall, and the Library on Monday,  May 23rd starting at 6pm. This outage will allow the contractor to make the new water line connections to Life Science.  The existing system is designed so that we must turn off the main line servicing several buildings in order to make campus repairs.  After the new system is completed will be able to isolate each building and back feed the others to avoid large campus water outages. Restrooms in other nearby buildings will be operational during this outage.

Week of May 9, 2011

Water Line Upgrade-Phase I

On Friday, May 13th at 8:00 p.m. water service to Life Science, University Hall, Library, Hammond Hall & Trimble Hall will be off until 12 a.m. Saturday morning. This will allow the contractor to make the new water line connections to Hammond/Trimble Hall and the Parking Garage.  The existing system’s design requires us to turn off the main line servicing several buildings in order to make campus repairs.  The new system being installed will allow us to isolate each building and back feed the others to avoid large campus water outages.